Hot Stuff Gifts & Collectables Logan Hyperdome commences construction

Week 6

The final push before the grand opening day.

20150505_164919 20150505_163124 20150505_163223 20150505_163302 20150505_164136

 

Week 5

Bar complete. Graphics installed. Flooring commenced. Stocking scheduled for next week.

2015-03-28 16.17.21 2015-03-28 16.18.17
2015-03-28 16.23.19 2015-04-02 20.16.08 2015-04-02 20.17.59 2015-04-16 19.59.07 2015-04-16 20.00.25 2015-04-16 20.01.10 2015-04-16 20.01.18 2015-04-16 20.01.46 2015-04-16 20.08.082015-04-16 20.02.12 2015-04-16 20.04.00 2015-04-16 20.05.21 2015-04-16 20.07.022015-04-16 20.11.26 2015-04-16 20.12.01 2015-04-16 20.12.32

Week 4

Shopfront installed. Ply slatwall complete. Bifold doors installed. Joinery “Bar” underway. The builder’s attention to detail has been exceptional. Everyone is excited and looking forward to seeing the final finished product. 1 more week to go!

2015-03-28 16.22.35 2015-03-28 16.22.59 2015-03-28 16.23.19

2015-03-25 15.23.35 2015-03-25 15.24.16 2015-03-25 15.24.34 2015-03-28 16.17.21 2015-03-28 16.18.17 2015-03-28 16.19.07 2015-03-28 16.19.31

 

 

Week 3

Custom slat wall trial was a success. Plywood to “portal” underway. Feature painting complete. Shop front and portal framing progressing well.

2015-03-14 14.06.03

2015-03-14 14.06.422015-03-11 16.01.432015-03-14 14.07.222015-03-14 14.05.372015-03-14 14.04.362015-03-14 14.07.47
2015-03-14 14.08.31
2015-03-14 14.20.30

Week 2

Back of house almost complete. Painting commenced. Shopfront framing underway. Wall display cabinet carcasses installed.

2015-02-20 15.46.25


2015-02-20 16.01.14

2015-02-20 17.50.192015-02-20 16.02.39

Week 1

Services roughed in. Ceiling and wall framing complete. Lining commenced.

2015-02-12 15.48.182015-02-12 15.48.322015-02-12 15.47.432015-02-12 15.47.192015-02-12 15.46.58 Shopfront-alt

Leave a Reply